+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445

Let's share timeline, PGWP March applicant

jubear

Hero Member
May 1, 2015
573
71
Job Offer........
Pre-Assessed..
Credit: A continuation of what Velaar started.

MEMBERS' UPDATED TIMELINES (These individual timelines have been sorted according to date of application)

Jawadchoudary
Applied: March 11th
Blank Update: N/A
Request for $100: May 20th
PGWP Approval: June 23rd
Mail Delivery: June 26, 2015
Total Processing Time: 108 days (From submission to receipt of mail)

Cyas33
Applied: March 17th
Blank Update: April 16th, May 16th, May 24th, June 15th
Request for $100: June 21st
PGWP Approval: June 24th
Mail Delivery: June 29, 2015
Total Processing Time: 105 days (From submission to receipt of mail)

Yukiyuki111
Applied: March 19th
Blank Update: May 27th, July 23rd
Request for $100: July 22nd (day 126)
PGWP Approval: July 27th
Mail Delivery: July 30, 2015
Total Processing Time: 134 days (From submission to receipt of mail)

Velaar
Applied: March 23rd
Blank Update: May 29th, Aug 14th
Paid $100: July 21st (Through CSE)
PGWP Approval: Sept 9th
Mail Delivery: September 17, 2015 Best News Ever of This Struggle!!
Total Processing Time: 179 days (From submission to receipt of mail) 5 Months, 26 days of waiting. (49.04% of 2015)

PadmaL
Applied: March 23rd
Blank Update: May 15th
Request for $100: July 3rd (Paid July 4th)
PGWP Approval: July 9th
Mail Delivery: July 16, 2015
Total Processing Time: 116 days (From submission to receipt of mail)

Pparisa
Applied: March 25th
Blank Update: June 1st, July 2nd
Paid $100: June 3rd (Through CSE)
PGWP Approval: July 3rd
Mail Delivery: July 10, 2015
Total Processing Time: 108 days (From submission to receipt of mail)

Deftones99
Applied: March 30th
Blank Update: N/A
Request for $100: June 11th (Paid June 12th)
PGWP Approval: Aug 12th
Mail Delivery: August 18, 2015
Total Processing Time: 142 days (From submission to receipt of mail)

Youssef.Simon
Applied: March 31st
Blank Update: June 10th, July 3rd
Request for $100: July 2nd (day 94)
PGWP Approval: July 3rd
Mail Delivery: July 10, 2015
Total Processing Time: 102 days (From submission to receipt of mail)

Pama
Applied: April 4th
Blank Update: Every month
Paid $100: July 21st
PGWP Approval: July 23rd
Mail Delivery: July 31, 2015
Total Processing Time: 119 days (From submission to receipt of mail)

Cheny189
Applied: April 8th
Blank Update: June 20th, June 23rd
Paid $100: May 9th (Through CSE)
PGWP Approval: July 16th
Mail Delivery: July 22, 2015
Total Processing Time: 106 days (From submission to receipt of mail)

Dirichletot
Applied: April 24th
Paid $100: Aug 14th
PGWP Approval: Sept 10th
Mail Delivery: Pending
Total Processing Time: 140 days (From submission to approval)

Issuetree
Applied: April 28th
Blank Update: July 9th, Aug 11th
Paid $100: Aug 17th
PGWP Approval: Sept 1st
Mail Delivery: September 9, 2015
Total Processing Time: 135 days (From submission to receipt of mail)

Vinothku
Applied: April 28th
Paid $100: July 6th (Through CSE)
Blank Update: July 10th, Aug 11th
PGWP Approval: Sep 21st
Mail Delivery: Pending
Total Processing Time: 147 days (From submission to approval)

Vig0610
Applied: April 29th
Paid $100: Aug 19th
Blank Update: April 30th, July 11th, Aug 7th
PGWP Approval: Sept 1st
Mail Delivery: Pending
Total Processing Time: 126 days (From submission to approval)

Cloud588
Applied: April 30th
Paid $100: May 15th (Through CSE)
Blank Update: July 17th, July 30th
PGWP Approval: Sept 15th
Mail Delivery: Pending
Total Processing Time: 139 days (From submission to approval)

Nevillek
Applied: May 2nd (Full amount paid)
Blank Update: June 4th, July 4th
Current Status: Waiting as of September 28th (day 150)

Lady0421
Applied: May 2nd
Paid $100: Aug 18th
Blank Update: June July 31, Aug 30th
Current Status: Waiting as of September 28th (day 150)

AnkitPandya
Applied: May 4th
Paid $100: Aug 19th
Blank Update: Monthly
Current Status: Waiting as of September 28th (day 148)

Deepicka
Applied: May 5th
Paid $100: July 31st (Through CSE), and requested for on August 13th
Blank Update: July 23rd, July 31st
PGWP Approval: August 18th
Mail Delivery: August 24, 2015
Total Processing Time: 112 days (From submission to receipt of mail)

Moelaghil
Applied: May 5th
Paid $100: Aug 20th
Blank Update: July 23rd, July 31st
Current Status: Waiting as of September 28th (day 147)

JoseCarlosG7
Applied: May 5th (Full amount paid)
Blank Update: Monthly
Current Status: Waiting as of September 28th (day 147)

FN111
Applied: May 5th
Paid $100: Aug 17th
Blank Update: Monthly
Current Status: Waiting as of September 28th (day 147)

Faisal Sandhu
Applied: May 6th
Paid $100: July 2nd (Through CSE)
Blank Update: Every month
PGWP Approval: Sep 8th
Mail Delivery: September 14, 2015
Total Processing Time: 123 days (From submission to receipt of mail)

FBR
Applied: May 6th
Paid $100: July 25th (Through CSE)
Blank Update: N/A
Current Status: Waiting as of September 28th (day 146)

Can_Can
Applied: May 6th
Paid $100: Aug 21st
Blank Update: N/A
Current Status: Waiting as of September 28th (day 146)

Nrkamath
Applied: May 6th
Paid $100: Aug 21st
Blank Update: July 25th, July 31st
Current Status: Waiting as of September 28th (day 146)

Jlsm
Applied: May 7th
Paid $100: June 29th (Through CSE)
Blank Update: July 23rd
Current Status: Waiting as of September 28th (day 145)

Chiliwilli
Applied: May 7th
Paid $100: Aug 25th
Blank Update: Monthly
Current Status: Waiting as of September 28th (day 145)

Keiths
Applied: May 7th (Full amount paid)
Blank Update: Monthly
PGWP Approval: Sep 17th
Mail Delivery: September 25, 2015
Total Processing Time: 142 days (From submission to receipt of mail)

Jijialex
Applied: May 9th
Paid $100: Aug 24th (Through CSE)
Blank Update: July 24th, July 31st
Current Status: Waiting as of September 28th (day 143)

La_danza
Applied: May 9th
Blank Update: June 8th, July 24th, July 31st, August 7th, Sept 6th
PGWP Approval: Sep 18th
Mail Delivery: September 23, 2015
Total Processing Time: 138 days (From submission to receipt of mail)

Salmaniut
Applied: May 9th (Full amount paid)
Blank Update: June 15th, July 26
PGWP Approval: Sep 10th
Mail Delivery: Pending
Total Processing Time: 125 days (From submission to approval)

Swprox
Applied: May 10th
Paid $100: Aug 21st (Through CSE)
Blank Update: June 12th, July 9th, Aug 8th
Current Status: Waiting as of September 28th (day 142)

Jiajialin92
Applied: May 10th
Paid $100: Aug 12th (Through CSE)
Blank Update: N/A
Current Status: Waiting as of September 28th (day 142)

GagzV
Applied: May 10th
Paid $100: Sept 8th
Blank Update: Monthly
PGWP Approval: Sept 21st
Mail Delivery: Pending
Total Processing Time: 135 days (From submission to approval)

Nikhil.Bhatia
Applied: May 10th
Paid $100: Aug 8th
Blank Update: June 10th, July 9th, Aug 10th, Sept 7th
PGWP Approval: Sep 21st
Mail Delivery: Pending
Total Processing Time: 135 days (From submission to approval)

Stinson24
Applied: May 11th
Paid $100: Sept 8th (Through CSE)
Blank Update: Aug 15th
Current Status: Waiting as of September 28th (day 141)

Valentine_59
Applied: May 12th (Full amount paid)
Blank Update: N/A
PGWP Approval: Sep 3rd
Mail Delivery: September 11, 2015
Total Processing Time: 123 days (From submission to receipt of mail)

Hardik0730
Applied: May 12th
Paid $100: Aug 19th (Through CSE)
Blank Update: July 22nd
PGWP Approval: Sept 4th
Mail Delivery: September 14, 2015
Total Processing Time: 126 days (From submission to approval)

LucaTony
Applied: May 12th
Paid $100: Sept 9th (Through CSE)
Blank Update: Monthly
Current Status: Waiting as of September 28th (day 140)

Soli82
Applied: May 12th
Paid $100: Sept 16th
Blank Update: N/A
Current Status: Waiting as of September 28th (day 140)

BPanthler
Applied: May 12th (Full amount paid)
Blank Update: N/A
Current Status: Waiting as of September 28th (day 140)

Nizolas
Applied: May 13th (Full amount paid)
Blank Update: Jun 12th, July 12th, Aug 10th, Aug 11th
Current Status: Waiting as of September 28th (day 139)

Arachsaloi
Applied: May 13th
Paid $100: Sept 16th
Blank Update: July 27th, Aug 9th
Current Status: Waiting as of September 28th (day 139)

Shippo7
Applied: May 13th
Paid $100: Sept 18th
Blank Update: July 27th, Aug 9th
Current Status: Waiting as of September 28th (day 139)

Gratuity
Applied: May 13th
Paid $100: July 29th (Through CSE)
Blank Update: Monthly
Current Status: Waiting as of September 28th (day 139)

NeedPermit
Applied: May 15th
Blank Update: June 14th, July 14th
Current Status: No request for $100 as of September 28th (day 137)

Star1002007
Applied: May 15th
Blank Update: N/A
Current Status: No request for $100 as of September 28th (day 137)

Hafm
Applied: May 15th
Paid $100: Aug 7th (Through CSE)
Blank Update: July 29th, Aug 7th
PGWP Approval: Sept 15th
Mail Delivery: Pending
Total Processing Time: 124 days (From submission to approval)

Rbel
Applied: May 15th
Blank Update: Monthly
Current Status: No request for $100 as of September 28th (day 137)

Mohsin9055
Applied: May 15th
Paid $100: Sept 21st
Blank Update: N/A
Current Status: Waiting as of September 28th (day 137)

Nandini09
Applied: May 18th
Blank Update: June 11th
Current Status: No request for $100 as of September 28th (day 134)

Aacan
Applied: May 18th (Full amount paid)
Blank Updates: June 17th, July 17th, Aug 3rd, Aug 30th
Current Status: Waiting as of September 28th (day 134)

Skelty
Applied: May 20th (Full amount paid)
Blank Update: July 31st, Aug 6th
PGWP Approval: Sept 21st
Mail Delivery: Pending
Total Processing Time: 125 days (From submission to approval)

Amrinder_Harika
Applied: May 23rd (Full amount paid)
Blank Update: N/A
Current Status: Waiting as of September 28th (day 129)

Jaison784
Applied: May 23rd (Full amount paid)
Blank Update: N/A
PGWP Approval: Sept 10th
Mail Delivery: September 17, 2015
Total Processing Time: 118 days (From submission to approval)

JuliettaG87
Applied: May 23rd (Full amount paid)
Blank Update: Monthly
PGWP Approval: Sept 18th
Mail Delivery: September 25, 2015
Total Processing Time: 119 days (From submission to approval)

Scc880420
Applied: May 25th (Full amount paid)
Blank Update: June 25th
Current Status: Waiting as of September 28th (day 127)

Jayrod
Applied: May 25th (Full amount paid)
Blank Update: Every Month
PGWP Approval: Sept 14th
Mail Delivery: September 21, 2015
Total Processing Time: 120 days (From submission to receipt of mail)

Manaspaliwal
Applied: May 27th (Restoration of Status and PGWP Application)
Blank Update: Every Month
PGWP Approval: Sept 18th (Good news indeed)
Mail Delivery: Pending
Total Processing Time: 115 days (From submission to approval)

Annie980
Applied: May 27th (Full amount paid)
Blank Update: Monthly
Current Status: Waiting as of September 28th (day 125)

Iviva
Applied: May 29th (Full amount paid)
Blank Update: Monthly
Current Status: Waiting as of September 28th (day 123)

Blue-J
Applied: June 1st (Full amount paid)
Blank Update: N/A
Current Status: Waiting as of September 28th (day 120)

Furious54
Applied: June 9th (Full amount paid)
Blank Update: N/A
PGWP Approval: Sept 9th
Mail Delivery: Pending
Total Processing Time: 93 days (From submission to approval)

Capelin
Applied: June 9th (Full amount paid)
Blank Update: Aug 22nd
Current Status: Waiting as of September 28th (day 112)

Hr603764
Applied: June 11th
Blank Update: July 11th, Aug 11th, Sept 9th
Current Status: Waiting as of September 28th (day 110)

LeinaDaniel
Applied: June 13th (Full amount paid)
Blank Update: Aug 2nd, Sept 1st
PGWP Approval: Sept 23rd
Mail Delivery: Pending
Total Processing Time: 103 days (From submission to approval)

Alienfingers
Applied: June 16th (Full amount paid)
Blank Update: July 17th, Aug 18th
PGWP Approval: Sept 1st
Mail Delivery: September 4, 2015
Total Processing Time: 78 days (From submission to receipt of mail)

Nosmas
Applied: June 16th (Full amount paid)
Blank Update: Sept 3rd, Sept 9th
Current Status: Waiting as of September 28th (day 105)

Nia_lht
Applied: June 23rd (Full amount paid)
Blank Update: N/A
Current Status: Waiting as of September 28th (day 98)

Natdn
Applied: July 5th (Full amount paid)
Blank Update: N/A
Current Status: Waiting as of September 28th (day 86)

Dukagjinasi
Applied: July 20th (Full amount paid)
Blank Update: N/A
Current Status: Waiting as of September 28th (day 71)

Xiaopan
Applied: July 25th (Full amount paid)
Blank Update: Monthly
Current Status: Waiting as of September 28th (day 67)

Vasu_26
Applied: Aug 8th (Full amount paid)
Blank Update: N/A
Current Status: Waiting as of September 28th (day 52)

Vimalind
Applied: Aug 27th (Full amount paid)
Blank Update: N/A
Current Status: Waiting as of September 28th (day 33)

Omolola
Applied: Sept 4th (Full amount paid)
Blank Update: Monthly
Current Status: Waiting as of September 28th (day 25)

CIC
Last update as of today was September 18, 2015
CIC is currently processing applications submitted on May 8, 2015
Official processing time as of today is 132 days for WP. Up by 12 days.
**New TRV (Inland) processing time for online applicants is 12 days
.

PLEASE NOTE:
1. Any PGWP applicants who visit this amazing forum and don't have their timeline profiles recorded on here should endeavour to provide their details truthfully. It helps everyone to keep track of things. If you want to be sure of your day counts please visit this site at http://www.timeanddate.com/date/duration.html. Be sure to select “Include end date in calculation.”

2. Once you've received a request to pay $100, or got an approval, or your PGWP, please remember to visit the forum again and update your fellow Members. Its important because it gives other applicants a bit of morale. Also, make sure that you renew your SIN by visiting your nearest Service Canada office at: http://www.servicecanada.gc.ca/cgi-bin/sc-srch.cgi?app=hme&ln=eng

3. If for whatever reason you email or call CIC (at 1-888-242‑2100), please feel free to share your findings in the forum.

4. If your individual processing time/day count exceeds the current CIC processing time of WP, please take the initiative to seek help from your Member of Parliament (MP) within your constituency (or residential area). Gather all evidence including your application number and let your MP know about your situation. To find your MP, use your current postal code via Parliament of Canada at: http://www.parl.gc.ca/Parlinfo/Compilations/HouseOfCommons/MemberByPostalCode.aspx?Menu=HOC.

5. If you paid only $155 and never paid the extra $100 for all OWP holders, please visit these two sites to pay and upload the remaining balance (receipt):
a) Online Payment at: https://eservices.cic.gc.ca/epay/welcome.do?lang=en. Once you are there follow the instructions below:
Click continue below > Accept disclaimer > Immigration > Temporary residence > Open work permit holder fee > type 1 for number of
applications > Submit > Pay. You will be asked to register on the online payment system in case you are not.

b) Case Specific Enquiry (CSE) at: https://secure.cic.gc.ca/enquiries-renseignements/canada-case-cas-eng.aspx?_ga=1.63908399.108801500.1431902909
Use this online form to upload the PDF receipt you received. First fill in your UCI, address, phone etc. Scan and upload it to the CSE.
Also, type a short precise message (in the message box) indicating your reasons. In that message don't forget to include your online
Application Number that begins with a W.

6. ** New TRV for those who want to travel after receiving their PGWP. Processing fee is $100 (the required docs for application include; passport copy, face/head photograph, IMM5257E form, and a copy of your PGWP). Please be aware that your PGWP doesn't give you the right to return to Canada. You need a new TRV that you apply for as a worker NOT as a student. To get more information on applying for a new TRV from WITHIN Canada, please go to: https://www.google.com/search?q=apply+for+new+TRV+within+Canada&ie=utf-8&oe=utf-8#q=Apply+for+new+TRV+from+within+Canada.

7. Unless its a family emergency, please make your travel plans carefully and wisely.

8. If you've been refused a PGWP and have lost status, please learn more about restoration of your status at: http://www.cic.gc.ca/english/resources/tools/temp/visa/validity/restoration.asp and apply for both restoration of status and PGWP simultaneously.

Congratulations to Aamro1992 (FP), Faisal Sandhu, Manaspaliwal, GagzV, Nikhil.Bhatia, Vinothku, Jayrod, Leina Daniel, and Skelty on the approval of their PGWP. Good luck on your job search.

To every applicant, I wish you the best and good luck in this waiting game. Keep the banter and positive vibe coming.

Cheers!
 

Awesome7

Full Member
Jun 6, 2015
32
12
Jubear, thanks for updating the timelines. I know a lot of former students who check out the forum, timeline updates, and the useful information that you provide. Its much appreciated.

Thank you.
 

chiliwilli

Full Member
Aug 24, 2015
41
0
Upppps now it is time to contact them! I applied on May 7th and they are working in applications received on May 8th... Or they say that...

I know we are few in the same situation, which helps a bit...

Cheers!!!
 

Furious54

Full Member
Sep 9, 2015
32
1
Job Offer........
Pre-Assessed..
dirichletot said:
My PGWP got approved September 10, and I still haven't got the mail. Is it normal? I guess not..
Mine was approved on September 09 and I am still waiting for it. I contacted CIC and they told me to call after October 21 (6 week) for the new document. I don't know what to do now except waiting for it.
 

nizolas

Member
Jul 18, 2014
19
0
Each week update the procesaing date is only moving by 1 or 2 days. Last weeke they were wotking on May 6th.
I have decided not to check anymore and just wait. This isn't good for my health...
 

needPermit

Star Member
Jul 9, 2015
177
24
Category........
AINP
Visa Office......
Ottawa
NOC Code......
2132
App. Filed.......
18-05-2016
Doc's Request.
07-06-2017
Nomination.....
02-05-2016
AOR Received.
18-08-2016
Med's Request
07-06-2017
Med's Done....
07-013-2017
Man, this is totally insane. I feel like they are doing it on purpose - to update the processing time by 1 or 2 days. This way they can turn away any callers calling for PGWP, because well, you application time hasn't exceeded the normal processing time and so you gotta wait.

Still waiting from May 15.
 

chiliwilli

Full Member
Aug 24, 2015
41
0
chiliwilli said:
Upppps now it is time to contact them! I applied on May 7th and they are working in applications received on May 8th... Or they say that...

I know we are few in the same situation, which helps a bit...

Cheers!!!
Ok, I just called CIC and I will share my experience:

Time since I started calling until the end: 29 min (you need a lot of patience!!!) I guess only 5 min talking with the agent

One nice lady answered, and after few questions... the more important ID or application reference... she proceeded to check my application

She told me that everything is ok, she saw my receipt of 100$ I submit after they requested it was there...

And eventually she told me that she is going to send a message to the department to tell them that they exceed the processing time and pleas to make a decission ASAP.

Thats all.

Again, encouragement everybody

And thanks, Jubear
 

nevillek

Hero Member
Apr 25, 2011
727
5
Mumbai
Visa Office......
New Delhi
Job Offer........
Pre-Assessed..
App. Filed.......
02-07-2013
IELTS Request
8.0
Med's Done....
20-06-2013
Interview........
N/A
VISA ISSUED...
05-07-2013
LANDED..........
23-08-2013
May 6th applicant here.

Today, the date has changed to May 8th so I called them asking for an explanation for no update on my application. She tells me that my file was opened on July 29th and requires additional 16 weeks of verification, for god knows what reason. So now, I have to wait till November 18.

Couldn't they have told this to me earlier?
 

JuliettaG87

Full Member
May 20, 2015
30
10
Received my PGWP today in the mail (got approved Sept 18th). FYI I live in Toronto, so it took exactly a week to deliver by mail!
 

lucatony

Full Member
Sep 10, 2015
20
0
Guys, I tried to call the agent today but cannot find a way to speak to an agent. I chose checking status ending up with typing in the application number and year of birth. It just saying that my application is being processed and no document is needed currently. I do not find an option to speak to an agent :'(
Does Cic have a filter which can block applicantion that is within the "normal processing time"? Or I chose a wrong option during the pre recorded voice? Thanks
 

chiliwilli

Full Member
Aug 24, 2015
41
0
I spoke with an agent after press options 3 (work permit), then 2, then 1, and eventually 0.

3, 2, 1, 0 and wait almost 25 min!!!! They say 15...

Good luck everybody
 

zwj1990623

Newbie
Sep 14, 2015
8
0
Hello, everyone. I have a question. I applied my PGWP on my 19, and recieved message from CIC to pay extra 100 free, and then I unload the receipt for the fee. But I forget to fill in the blank, which is about personal information: address, name. Is it a big deal and if so what am I suppose do???? Thank you
Waiting over 4 months....
 

BPanthler

Newbie
Sep 24, 2015
8
0
nevillek said:
May 6th applicant here.

Today, the date has changed to May 8th so I called them asking for an explanation for no update on my application. She tells me that my file was opened on July 29th and requires additional 16 weeks of verification, for god knows what reason. So now, I have to wait till November 18.

Couldn't they have told this to me earlier?
Same here, May 12 applicant - gone for additional verification. I talked to my MP office but they couldn't help.
I have heard that it doesn't really take that long though... so hopefully..
 

nevillek

Hero Member
Apr 25, 2011
727
5
Mumbai
Visa Office......
New Delhi
Job Offer........
Pre-Assessed..
App. Filed.......
02-07-2013
IELTS Request
8.0
Med's Done....
20-06-2013
Interview........
N/A
VISA ISSUED...
05-07-2013
LANDED..........
23-08-2013
BPanthler said:
Same here, May 12 applicant - gone for additional verification. I talked to my MP office but they couldn't help.
I have heard that it doesn't really take that long though... so hopefully..
Do you know the reason for additional verification? Did you have a semester break or applied for PR in the past by any chance?