+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
What does a Ghost update mean/look like? When I signed in with my GCKEY today the status said Application update then when I clicked on messages there were none and when I went back to home page the status switched back to submitted. Is this a ghost update or is that something else?
 
What does a Ghost update mean/look like? When I signed in with my GCKEY today the status said Application update then when I clicked on messages there were none and when I went back to home page the status switched back to submitted. Is this a ghost update or is that something else?
Yes its a GU
 
I received my log in information Feb 7th 2023. I summited the declaration, address and photo the same day. And I haven't heard anything from VO Calgary. Does anybody else have the same issue
 
I received my log in information Feb 7th 2023. I summited the declaration, address and photo the same day. And I haven't heard anything from VO Calgary. Does anybody else have the same issue

Me too, I've sent on Feb 6th, 2023 to Etobicoke... but I put the wrong entry date... I want to know how bad this is.
 
Do we need to link our PR card application from Portal to GC Key? When can we do that? After uploading image?
 
PR Confirmation e-mail - Feb 08th 2023, 1:05PM - Etobicoke. (Replied the same day).
Email with PR Portal credentials - Feb 09th 2023, 5:39PM (declaration and photo submitted the same day).
eCoPR generation date - Feb 15th 2023, 4:21PM (eCoPR for me and spouse).
PR Cards received - Pending
VO - CPC Ottawa (PR Confirmation e-mail came from Etobicoke?).
 
  • Like
Reactions: gottagetthatpr
I received my log in information Feb 7th 2023. I summited the declaration, address and photo the same day. And I haven't heard anything from VO Calgary. Does anybody else have the same issue
If you have a look at everyone’s tracking in this thread, you’ll note that receiving eCOPR after declaration/address/photos ranges anywhere from 3 days to 2-3 months. As you’re only at day 8, this is not an “issue” but within normal processing times.
 
One Piece of Information I wish to share.. When my PR card was delivered it was not put in the post box it was just kept near the common area which is a big red flag from Canada Post. I am not sure why IRCC cannot send such an important document via registered post which has some tracking.
 
One Piece of Information I wish to share.. When my PR card was delivered it was not put in the post box it was just kept near the common area which is a big red flag from Canada Post. I am not sure why IRCC cannot send such an important document via registered post which has some tracking.
thanks for sharing. did you get ghost update before the "approval" status of PR card?
 
thanks for sharing. did you get ghost update before the "approval" status of PR card?

I got a GU after the approval. My PR card was approved on 6th Feb, no update i logged in GC Key and checked it. On 7th i got a GU not sure if that is when it was shipped.

But it shipped from CPC Sydney NS and it took about 6 Business days to arrive in Metro Vancouver Area.
 