Angry at how slowly my app went (3.5 months instead of the expected 11 days), as well as the short period (approved only for like 6 months), we ordered the notes. They came late of course (because IRCC, duh)
Nothing useful. Over 50 pages of just status updates & lines saying status: system error etc. Most status blocks do not even have dates
How does one read those? What should I look for?
We are specifically looking for what took so long to approve and why it was approved for only such a short while.
Anyone familiar with the topic or can shed light on what we should look for?
Nothing useful. Over 50 pages of just status updates & lines saying status: system error etc. Most status blocks do not even have dates
How does one read those? What should I look for?
We are specifically looking for what took so long to approve and why it was approved for only such a short while.
Anyone familiar with the topic or can shed light on what we should look for?