CandC2009
Star Member
- Mar 28, 2011
- 165
- 3
- Category........
- Visa Office......
- Buffalo
- Job Offer........
- Pre-Assessed..
- App. Filed.......
- 11/2010
- AOR Received.
- 31/03/2011
- File Transfer...
- 26/01/2011 (Buffalo received)
- Med's Done....
- 10/2010
OMG! In process Finally!!!!!!!!!!!!!!!!!!!!!
Checked Ecas and
We started processing your application on September 22, 2011.
Yay!!!
	
		
			
		
		
	
				
			Checked Ecas and
We started processing your application on September 22, 2011.
Yay!!!
 
	
 
	 
 
		 
 
		

 
 
		 
  
 
		 
 
		 
 
		 Given that most of the assessments haven't even been started, the zeros in the "finalize application" section don't mean anything. I think the default is zeros in GCMS until someone activates that sub-heading. Just my guess. As far as the "due date," a lot of people are not sure of what it means. I believe it is the timeframe they have locked in the system for ur app to be concluded, which is a very good sign you'll get PPR soon. Let's see if they'll be able to get all those checks done by....not sure if it's November or October.
 Given that most of the assessments haven't even been started, the zeros in the "finalize application" section don't mean anything. I think the default is zeros in GCMS until someone activates that sub-heading. Just my guess. As far as the "due date," a lot of people are not sure of what it means. I believe it is the timeframe they have locked in the system for ur app to be concluded, which is a very good sign you'll get PPR soon. Let's see if they'll be able to get all those checks done by....not sure if it's November or October. 