hi guys,
I have been requested to upload the schedule A on Jan 25/2016, I submitted the document the second day (Jan 26/2016) . (AOR in Jan BTW)
then the BG check says : Provided.
no change since then.
has anyone get the same status as mine?
does anyone knows why it stuck at that point? and how long it will say in progress or not needed?
many many thanks.
I have been requested to upload the schedule A on Jan 25/2016, I submitted the document the second day (Jan 26/2016) . (AOR in Jan BTW)
then the BG check says : Provided.
no change since then.
has anyone get the same status as mine?
does anyone knows why it stuck at that point? and how long it will say in progress or not needed?
many many thanks.