My question is very simple and in the title:
Can I accept and start a new job if I am waiting for a BOWP based on my PR application? I previously held a BOWP while I was waiting for PR through AINP (it is still in process).
I have an Open work Permit. I read online that the conditions are the same as whatever condition your current WP has. My SIN number will be expired though, will that cause a problem? I know I can continue working with an expired SIN.
Please help, with links if possible.
thank you.
Can I accept and start a new job if I am waiting for a BOWP based on my PR application? I previously held a BOWP while I was waiting for PR through AINP (it is still in process).
I have an Open work Permit. I read online that the conditions are the same as whatever condition your current WP has. My SIN number will be expired though, will that cause a problem? I know I can continue working with an expired SIN.
Please help, with links if possible.
thank you.