Looking at the ongoing FSW&CEC PPR rain and the backlog numbers, waiting a bit longer (3-4 months) for all program draws is becoming a bit more sensible for fellas with CRS 475+. @Glaber did the math and it seems almost everybody is landing this year, meaning that IRCC will need to conduct draws in a few months to prepare for 2023 targets.
Could happen in about two months around May with the new TEER system (which doesn't change anything at all for NOC 0 and A peeps and a good portion of NOC B fellas).