+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
arjignesh said:


Yes U r true..they are slow but in your case not..
U have applied on FEB-11 as per your time line..
So wait for 5-6 months i.e. july/aug for In Process sir..

people applied last oct-nov still in process...

Just keep patience ...

all the best



:) :) :)Thanks brother, You are right but my friend same occupation got in process status, he is Jan211 applicatnt. In Process after 2 months of RBVO. process started on his application from 31st of this May.

But I know here is much more random things regarding ecas.

InshAllah, there will be good new for all of us.


thanks alot
 
mandiebraxton said:
Oh..this is wonderful! Congrats!! Mandie

thank u!! ;D
 
My first file reached by DHL and delivered and signed by GLEN on 10june2011 3-30pm.Then i sent missed police clearance of my spouse again by DHL on13june2011 which was delivered and signed for by GLEN on 21 june 2011 3-30pm.Now i m thinking which date they will consider because i send then email and faX to matchup both the documents.
 
Applications received toward the overall cap: 14,054 of 20,000 as of June 28, 2011

Applications received per eligible occupation:
Eligible Occupation
(by National Occupational Classification [NOC] code) Number of Complete Applications Received*
0631 Restaurant and Food Service Managers 1,000
(Cap reached)**
0811 Primary Production Managers (except Agriculture) 189
1122 Professional Occupations in Business Services to Management 1,000
(Cap reached)**
1233 Insurance Adjusters and Claims Examiners 466
2121 Biologists and Related Scientists 1,000
(Cap reached)**
2151 Architects 1,000
(Cap reached)**
3111 Specialist Physicians 1,000
(Cap reached)**
3112 General Practitioners and Family Physicians 1,000
(Cap reached)**
3113 Dentists 1,000
(Cap reached)**
3131 Pharmacists 1,000
(Cap reached)**
3142 Physiotherapists 406
3152 Registered Nurses 1,000
(Cap reached)**
3215 Medical Radiation Technologists 82
3222 Dental Hygienists and Dental Therapists 54
3233 Licensed Practical Nurses 538
4151 Psychologists 234
4152 Social Workers 863
6241 Chefs 190
6242 Cooks 393
7215 Contractors and Supervisors, Carpentry Trades 214
7216 Contractors and Supervisors, Mechanic Trades 484
7241 Electricians (except Industrial and Power System) 249
7242 Industrial Electricians 276
7251 Plumbers 71
7265 Welders and Related Machine Operators 87
7312 Heavy-Duty Equipment Mechanics 68
7371 Crane Operators 14
7372 Drillers and Blasters – Surface Mining, Quarrying and Construction 29
8222 Supervisors, Oil and Gas Drilling and Service 147

*The number of complete Federal Skilled Worker applications received as of June 28, 2011 is approximate.

**Once the cap has been reached, we can only accept applications for this occupation from people with an existing offer of arranged employment.

NOTE: Because application intake fluctuates, these figures are meant as a guide only. There is no guarantee that an application sent in now will fall within the cap.
 
toronto_dream2 said:
My first file reached by DHL and delivered and signed by GLEN on 10june2011 3-30pm.Then i sent missed police clearance of my spouse again by DHL on13june2011 which was delivered and signed for by GLEN on 21 june 2011 3-30pm.Now i m thinking which date they will consider because i send then email and faX to matchup both the documents.

I think it would be 10th June, when the bulk of the application pack was received. Is police clearance mandatory on initial application for you VO? Also check if you payment has been processed. All the best....Mandie
 
Sachin Abraham said:
Yes , actually.

Activities by NDVO seems to have slowed down drastically as we approach JULY :(

Has your eCAS status changed to RBVO ??
 
nokiadesire said:
Has your eCAS status changed to RBVO ??

Nokia desir,

do let me know when your ECAS get RBVO...as mine and your timlines are closer.
 
linksalman said:
Nokia desir,

do let me know when your ECAS get RBVO...as mine and your timlines are closer.

Sure, I'll be thrilled to shout it out loud as I am so DESPERATE for it to happen!!
 
nokiadesire said:
Has your eCAS status changed to RBVO ??


Not yet brother.
Still not rbvo yet,
its possible that the postal strike is affecting though :(
will keep you updated :)
 
Dear Fellows,

We submitted our application on 7th of June 2011 under 3112 ( Cap was 962 at that time) and our application reached CIO on 14th of June.
on 15th the website showed Cap to be full.

I want to know what are the chances our application got through and if not whats the time frame that we should keep in mind for recieving our application back.

Secondly would they consider the application as cap is getting re-initiallized for 500 mark.

Please share your thoughts.

Regards

ZCM
 
zeeshanchristy said:
Dear Fellows,

We submitted our application on 7th of June 2011 under 3112 ( Cap was 962 at that time) and our application reached CIO on 14th of June.
on 15th the website showed Cap to be full.

I want to know what are the chances our application got through and if not whats the time frame that we should keep in mind for recieving our application back.

Secondly would they consider the application as cap is getting re-initiallized for 500 mark.

Please share your thoughts.

Regards

ZCM
The chances of making the cap is very SLIM if not ZERO bcos CIO takes about 2 weeks to process payment, an indication ur application met completeness check. By this time, I believe the cap would have long been reached.
Well, reg the new instruction, no one knows the point allocation and whether they are going to change the application forms. Thus your applicatin is highly at riskof being returned if there is a slight change to the instruction for post post July 2011 applications. Mandie
 
how about if the application reached there when the cap was near to max. do u mean after completeness check only application will be counted within the cap? :( :(worried my application reached on 9th while on 7th it was 962 and on 15th reached max.now almost 3rd week and yet to have my application meet completeness checked?
mandiebraxton said:
The chances of making the cap is very SLIM if not ZERO bcos CIO takes about 2 weeks to process payment, an indication ur application met completeness check. By this time, I believe the cap would have long been reached.
Well, reg the new instruction, no one knows the point allocation and whether they are going to change the application forms. Thus your applicatin is highly at riskof being returned if there is a slight change to the instruction for post post July 2011 applications. Mandie
 
string11 said:
how about if the application reached there when the cap was near to max. do u mean after completeness check only application will be counted within the cap? :( :(worried my application reached on 9th while on 7th it was 962 and on 15th reached max.now almost 3rd week and yet to have my application meet completeness checked?

Your application reached there on 14th and on 15th, they announced cap reached. The figure given is only an approximate...so it could well be above the the 962. CIC will not take 1 day to look at your application..2 weeks if u r lucky to have ur payment processed. To be sure, check if you have your CC/DD encashed. Mandie
 
ecas status changed to RBVO: June 29, 2011.