+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
Alert for those who are in plan to submit New file .

Important Notice

New forms and an updated Instruction Guide and Document Checklist (IMM 5612) are now available. Applicants should follow the new Instruction Guide when preparing to submit an application

Applications that are received by the Centralized Intake Office (CIO) on or after November 14, 2011 that have not been prepared using the updated Instruction Guide and the Document Checklist (IMM 5612), will be returned as incomplete.

Note: As of July 18, 2011, applicants for Permanent Residence are asked to complete the new Generic Application Form for Canada (IMM 0008). Applicants are encouraged to complete the form electronically and validate the information to generate 2D barcodes before printing. To ensure you have the most recent application form, please use the link to the application form below.

Ref: http://www.cic.gc.ca/english/information/applications/skilled.asp

Please pay attention to it.


Regards
Mayank
 
mayankpandya said:
Alert for those who are in plan to submit New file .

Important Notice

New forms and an updated Instruction Guide and Document Checklist (IMM 5612) are now available. Applicants should follow the new Instruction Guide when preparing to submit an application

Applications that are received by the Centralized Intake Office (CIO) on or after November 14, 2011 that have not been prepared using the updated Instruction Guide and the Document Checklist (IMM 5612), will be returned as incomplete.

Note: As of July 18, 2011, applicants for Permanent Residence are asked to complete the new Generic Application Form for Canada (IMM 0008). Applicants are encouraged to complete the form electronically and validate the information to generate 2D barcodes before printing. To ensure you have the most recent application form, please use the link to the application form below.

Ref: http://www.cic.gc.ca/english/information/applications/skilled.asp

Please pay attention to it.


Regards
Mayank
dear applicants ndvo who were 10 to 12 days ahead of me on rbvo received aor by ndvo by 1st july.accordingly my 2nd aor should be before 12 july. But its not till 19july
 
any april applicant ndvo post june whose rbvo bet 5june2011- 15june 2011 pl reply
 
arjignesh said:
Moderator,,,Please...

Please update my status in spreadsheet..as I already finished Medical on 11-06-2011 and sent the RPRF...+PCC

Medical issued on 18-05-2011.

Also please correct my name...its spelling mistake...


Regards,
Done...Sorry took this long....Mandie
 
Thanks for update..

As per the spreadsheet look like after Jan-11 applicant only 2 of them got the PPR...all others are waiting....

Hope in this month we can hear something..

all the best to all......
 
Applications received per eligible occupation: 21.07.2011
Eligible Occupation
(by National Occupational Classification [NOC] code) Number of Complete Applications Received*
0631 Restaurant and Food Service Managers 5
0811 Primary Production Managers (except Agriculture) 2
1122 Professional Occupations in Business Services to Management 52
1233 Insurance Adjusters and Claims Examiners 3
2121 Biologists and Related Scientists 5
2151 Architects 7
3111 Specialist Physicians 3
3112 General Practitioners and Family Physicians 3
3113 Dentists 3
3131 Pharmacists 4
3142 Physiotherapists 2
3152 Registered Nurses 26
3215 Medical Radiation Technologists 1
3222 Dental Hygienists and Dental Therapists 1
3233 Licensed Practical Nurses 3
4151 Psychologists 1
4152 Social Workers 10
6241 Chefs 3
6242 Cooks 4
7215 Contractors and Supervisors, Carpentry Trades 4
7216 Contractors and Supervisors, Mechanic Trades 3
7241 Electricians (except Industrial and Power System) 0
7242 Industrial Electricians 2
7251 Plumbers 0
7265 Welders and Related Machine Operators 2
7312 Heavy-Duty Equipment Mechanics 3
7371 Crane Operators 0
7372 Drillers and Blasters – Surface Mining, Quarrying and Construction 0
8222 Supervisors, Oil and Gas Drilling and Service 3
 
Hi All,

Im new to this blog.

Would like to join in and share my timelines.

NOC : 3142
AOR : 8th May 2011
RBVO : 12th July.

Waiting for Inprocess and medical request to come soon. Do they both come together.

Many thanks

RPT
 
reji said:
Hi All,

Im new to this blog.

Would like to join in and share my timelines.

NOC : 3142
AOR : 8th May 2011
RBVO : 12th July.

Waiting for Inprocess and medical request to come soon. Do they both come together.

Many thanks

RPT
[/quote
When did CIO receive your application? Mandie
 
Application received on 2nd May.
 
Application received on 2nd May & PER received on 8th May :o Unbelievable timeline :o :o
 
Hi everybody
Less activity on this forum
I have recive my PER at 27 July
Yupiiiiiiiiiiiii