Hello everyone. Going through the forums I realized that the letter has to be in a specific format containing duties from the "lead statement" as well as most of the posted job duties.
It has confused me greatly as I used to work as an Electrical Engineer for a consultancy firm previously that installed solar panels and associated power systems using the PV technology. My ex boss stated that I prepare a draft and submit it to him so he understand my letter requirements.
How do I get started ?
It has confused me greatly as I used to work as an Electrical Engineer for a consultancy firm previously that installed solar panels and associated power systems using the PV technology. My ex boss stated that I prepare a draft and submit it to him so he understand my letter requirements.
How do I get started ?