+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
Status
Not open for further replies.
Mushfiq_1987 said:
168 days since my application was received..

Bank says DD was cashed last week of October..

46 days since I have emailed CIC, still no reply..

Tried calling but no luck, agent says they don't keep any information of the FSW applicants (I know its a big fat lie).. what can I do? I am hopeless now :(

You should receive their reply in maximum 10 days time. They reply in about 53-55 days time.
 
Friends my FBI PCC is rejected( after wait of 3.5 months) due to poor quality of fingerprints Sad. I got it done from US Local Police Station thinking that might be the safest bet. Has anyone done fingerprinting in US if yes what is the best place to get it done?

Also what is the latest date that has received MR,PCC request, mine is July 16 application wondering if i have enough time in hand now Cry
 
Dear Friends,

My application under NOC 2133 was received at CIC on 9th October 2014. So do you think that completeness check is done?

Also when do u estimate I would be charged ?
 
After my medical is done online line was updated as below

Medicals received.
So does it mean that medicals are ok? Or Yet there can be issues in medicals?
please advice
 
Vande Matram said:
Can somebody throw some light on procedure at VO ?
When verification is done ? is it before processing started or after processing started ?

I am June 23 applicant and received my PER on Oct 21..
Neither second line updated nor MR received
Getting anxious now......

Please find below details provided by formuties

Quote from: Diplomatru on December 11, 2014, 03:04:34 am
First line is displayed after Data Entry, the step following Cost recovery at CIO. This is when an electronic file is created in GCMS. PER, AOR and file transfer don't trigger a CAS update.

Second line appears when the assigned IPA opens file in GCMS and begins processing it by initiating document verification and criminality check. Upon completion he/she sends MR.

Third line appears when medical results are received and approved by CIC. Then IPA launches security check.

Fourth line appears upon completion of security checks and final determination of admissability and eligibility by IPA. As a result an applicant generally receives PPR

Quote from: cjg1987 on December 01, 2014, 02:17:43 am

Background & Security Checks

Note: Our Background Check comprises of 2 parts:
1. The Standard Documentation Checks,
2. The Security & Criminality Checks.

Standard Documentation Checks:
Our background check is done at the CHC stage. It commences the moment our file gets the 1st BFD by the VO. An indicator of which is the e-CAS that shows "In Progress". All docs been checked & our NOC being tallied against the MI, if the VO finds our case 'eligible' for Canadian PR, the file becomes 'Accepted'; and then it goes for standard background checks, viz. Exp, Quals, Adaptability, Qualitative Considerations etc.

The process involves many things. If our case file is well presented and the enclosures vouch the quality-quantity, adequate POF docs etc., there might not be a requirement of 'actually' calling the employers, references etc. The VOs have a way with that, they are experienced enough to ascertain the logical disposition of our case. But, if there are any concerns of his/her, s/he is likely to ask for additional docs, do further scrutiny vide any means [calling, visiting etc.] & might ask for an Interview.

-Culmination: When 'fully' satisfied, we get the 'Medical Request'.
-Timeframe: Can be anything around 3-8* months, for the 'fast track' system (Avg. 4-5 months).
-eCAS: Continues to Show 'In Process'.


Security & Criminality Checks:
A part of the b/ground checks is the 'Security Check'. It commences after our med results are submitted to the CHC. This is a major activity -mainly concerning our 'safe inclusion' into the Canadian Soil; vis-a-vis, Political, Socio-Econmical, Anti-Social disposition, perceived Threat to Canada's integrity etc. This gets us the SDEC, CDEC & SECCRIM.

This is a serious & time-consuming stage, involving many agencies, including CSIS, Interpol, NASC, Database Checking & touch-base with Local Police. Many things are considered here... the No. of countries visited, Applicant coming from 'certain' countries, ex-Servicemen [including Law Enforcement services], Prolonged stay in a country w/out sufficient docs to prove cause, frequent traveling to certain nations, your *Name (?), Inter-Religion/Nationality Marriages etc.

If everything is simple & straight, the file soon gets into the 'final review' stage. If there are any 'red flags', our case goes into a 'spin'. Then our file might go to the local Police/CID agencies; the outcome/timeframe of which is beyond the control of CIC. And thereby the timeframe can be anything [sometimes beyond 1yr]. But, usually this stage should be over by 5 months max. However, a point to be noted is that we can also be called for an Interview [at this stage], due to this reason
 
dkd2014 said:
What I think, 207 are with completeness check done and payments forms sent for fee collection which are also in que.
And application sent for elgiblity review (67 passing marks and NOC matching etc.) by senior officer.
Many forumites like sandeep7972, Dave123, Sunnynitian, (all applicants dtd. 24/09/14) have received their PERs.
So 700 apps are upto 24th Sep by rough estimation.
As quoted by other forumites in earlier posts, completeness check upto mid Nov would have been completed by mid Dec, 14.
and 207 pending applicants are from 24th Sep to Mid Nov.

Above are just guestimates. Forumites may throw light.

Hi,

I absolutely agree with your understanding.

Regards,
 
CanOl said:
You should receive their reply in maximum 10 days time. They reply in about 53-55 days time.

Is there still any chance for me getting PER?
 
After How many days should one call the CIC for UCI number????? :-[
 
daxexpert said:
You can see the date below where they usually mention the PhD candidates' details...

Thanks for sharing the details.
Yes i do see the note that the app for the PHD portions are as of November 19, 2014, but is this true for other applications too?
Thanks.
 
Hello seniors....
I have applied for NOC 3012 and my application received on 16 sep but no update yet. :'(
But now i want to send my another application for NOC 3011
Therefore i want to ask few things
1 i have already sent my IELTS and PCC original copy, so what i need to do now?
2 i have only one year of experience of NOC 3011 which is going to complete by the end of December and i have 4 years of experience for NOC 3012. So are they going to score me on 5 years of experience or only one year??????
 
Dear Friends....
I request you to all Kindly Suggest me, noc 2132 Mechanical engineering is going to reach the cap.
So I planned to apply noc 2232 mechanical Engineering technologist and Technicians.
This will work or not ? Basically Am Mechanical Engineer Working as a quality Control Engineer in construction
Industry.
Main Duties. 1. Arranging and Conducting Inspection for Installed Curtain Wall Units.
2. Supervise and Monitoring the site Installation to find Errors and rectification
as per approved Shop drawing.
3.Responcible for final Inspection and Handing over.
4.Responsible for water testing to observe and rectification if leakages occurs.
5.Preparing Method statement and Inspection test Plan for Site installation and Inspection.

Your Prompt reply highly appreciated.
 
borno212 said:
Dear Seniors,

Need your suggestion ASAP. My second application for 2172 will reach CIC by tomorrow.

But my first application was for 2171 on October 1. According to today's CIC update, there are still 161 applicants waiting for MI Completeness.

Thus, it may create problem if both of my applications Fall under CAP. In this scenario, should I cancel my Delivery of 2172?.

Please, help me with your soonest honest suggestion.

Regards....

I know one guy in watapp group noc 2171 application date sep 17th got a mail that it didnt made it cap..
As per my knowledge if somebody get through this 161 no its should be between sep 2nd and sep 17th..
so please dont cancel ur app for 2172 let it reach
all the best for ur new app
 
manishverma1978 said:
After How many days should one call the CIC for UCI number????? :-[

Call after about 75-80 days and try your luck.
 
Status
Not open for further replies.