+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
Congrats Jacob.... expecting lot of updates tomorrow
 
Hi All,

i have to send one formal letter to canadian high commission for udpating my current employer, as i have changed the job and join another company. I just want to confirm the addres where i have to send the document. so can any one confirm the address mention below...

"CANADIAN HIGH COMMISSION
IMMIGRATION SECTION
P.O.BOX 5209
CHANAKYAPURI,
NEW DELHI-110021(INDIA)."

Regards,
Vipal
 
hi the address is correct but its better not using po box in that as what blue dart courier told me and the removed that from the address as courier cannot deliver at po box
 
sachin4canada said:
hi the address is correct but its better not using po box in that as what blue dart courier told me and the removed that from the address as courier cannot deliver at po box

OK.. thanks buddy...
 
@ Friends,

Last few days have witnessed at least 17 new members (Newbie's) in April, May and File Xfer threads. WELCOME ABOARD FRIENDS.
Your active participation will immensly help this threads stay on top and informative.

(1) Kish7
(2) Deepaksinghal
(3) Kristhapa
(4) Ramansra685
(5) Vicky_delhi
(6) rksharma
(7) batista32036
(8) Nikhilmetha
(9) GIBALA
(10) Raj10
(11) Ayk
(12) dattasuvendu
(14) A.Joshi
(15) desirecanada
(16) armanican
(17) Thommo
 
Hi all,
I have got my RPRF receipt today. Date of encashment is 15-11-2010 and date of dispatch is 24-11-2010 and I got it today i.e. 6-12-2010.
Regards,
gauri :) :) :)
 
well congrats
gauri said:
Hi all,
I have got my RPRF receipt today. Date of encashment is 15-11-2010 and date of dispatch is 24-11-2010 and I got it today i.e. 6-12-2010.
Regards,
gauri :) :) :)
 
Hi All,

I have a basic question....

Received Medical /PPR /RPRF request on NOV 1st.

That means I have 45 days deadline which is December 15th.

I did my medicals on 2nd December and DMP informed that they will send the results in 8-10 days so that means they will send results by around 10 or 12th of December and it might take 2-4 days to reach ottawa.

I am going to submit passport on Dec 10th so it will reach CHC ND on 13th or 14th Dec.

Now will VO open my file on December 15th and see if all documents are placed.....

I doubt my medicals report might have not reached by that time so when next it will be considered to open vo.How the BFD will work in this case.

Can someone throw light on my queries....

Thanks
Laxmikanth
 
congrates!!!!!!!!!!! this is really gd news.


gauri said:
Hi all,
I have got my RPRF receipt today. Date of encashment is 15-11-2010 and date of dispatch is 24-11-2010 and I got it today i.e. 6-12-2010.
Regards,
gauri :) :) :)
 
laxmikanthms said:
Received Medical /PPR /RPRF request on NOV 1st.
That means I have 45 days deadline which is December 15th.
I did my medicals on 2nd December and DMP informed that they will send the results in 8-10 days so that means they will send results by around 10 or 12th of December and it might take 2-4 days to reach ottawa.
I am going to submit passport on Dec 10th so it will reach CHC ND on 13th or 14th Dec.
Now will VO open my file on December 15th and see if all documents are placed.....
I doubt my medicals report might have not reached by that time so when next it will be considered to open vo.How the BFD will work in this case.
Can someone throw light on my queries....
Laxmi I read somewhere that second BFD will be assigned which is about 20 days time but I am not sure if thats the way it works
 
gauri said:
Hi all,
I have got my RPRF receipt today. Date of encashment is 15-11-2010 and date of dispatch is 24-11-2010 and I got it today i.e. 6-12-2010.
Regards,
gauri :) :) :)

Congrats Gauri....
 
Congratulations & good luck for next step.

Regards,
Mayank

gauri said:
Hi all,
I have got my RPRF receipt today. Date of encashment is 15-11-2010 and date of dispatch is 24-11-2010 and I got it today i.e. 6-12-2010.
Regards,
gauri :) :) :)
 
| S.No | Name | NOC | File xfer| Doc Sent| 2nd AOR| ECAS| Med/PPR| Got Visa
| 01| letsgocanada| 4131| 19 Jan| 07 Apr| 09 Apr| In Process| 07 Oct|
| 02| anupshinkoo| 0111| 20 Jan| 19 Apr| 22 Apr| In Process| 02 Oct|
| 03| Benjamin Sapkota| 4131| 20 Jan| 30 Apr| 12 May| In Process| 27 Sep|
| 04| caforca| 0111| 20 Jan| N/A| 25 May| In Process| 05 Oct|
| 05| jacob333| 3142| 20 Jan| 06 May| 16 May| Decision Made| 01 Oct| 29 Nov
| 06| Gav| 4131| 27 Jan| 09 Apr| 21 Apr| In Process| 06 Oct|
| 07| vicky_delhi| 0213| 27 Jan| 17 May| 25 May| In Process| 05 Oct|
| 08| sja| 3152| 02 Feb| 09 Apr| 23 Apr| In Process| 21 Oct|
| 09| pshhe| 1111| 02 Feb| 31 May| 01 Jul| In Process| |
| 10| prsh_patel| 0213| 03 Feb| 26 Mar| 03 Apr| Decision Made| 02 Jul| 24 Oct
| 11| purvi2802| 4131| 03 Feb| 23 May| 02 Jun| RBVO| |
| 12| saky626*| 0213| 03 Feb| 23 May| 12 Jun| In Process| 21 Oct|
| 13| batista32036| 1111| 03 Feb| 05 Jun| 15 Jun| In Process| |
| 14| Naavy100| 0111| 06 Feb| 12 Apr| 23 Apr| In Process| 11 Nov|
| 15| thomas78| 0213| 08 Feb| 02 Apr| 08 Apr| In Process| 18 Oct|
| 16| subhash| 0213| 10 Feb| 29 Mar| 07 Apr| Decision Made| 01 Jul| 26 Nov
| 17| nwaraich| 4131| 10 Feb| 06 Apr| 08 Apr| In Process| 21 Oct|
| 18| sachin4canada| 3111| 10 Feb| 21 Apr | 22 Apr| In Process| 20 Oct|
| 19| duttasuvendu| 4131| 10 Feb| 08 May| 25 May| In Process| 08 Nov|
| 20| konda| 4131| 10 Feb| 10 May| 21 May| In Process| |
| 21| lakshmikanthms| 0213| 10 Feb| 27 May| 14 Jun| In Process| 01 Nov|
| 22| cbi| 1111| 17 Feb| 12 May| 21 May| In Process| |
| 23| lavanyar| 4131| 17 Feb| 12 May| 25 May| In Process| |
| 24| ramansra685| 4131| 17 Feb| 03 Jun | 08 Jun| In Process| |
| 25| isha| XXXX| 17 Feb| XXXX| 10 Jun| In Process| 11 Nov|
| 26| aman.pb7| 4131| 17 Feb| 11 Jun | 18 Jun| RBVO| |
| 27| capr| 0213| 17 Feb| 11 Jun | 23 Jun| RBVO| |
| 28| singh092120| 9212| 17 Feb| 26 Mar| 06 Apr| In Process | |
| 29| chandigarthrocks| 4131| 17 Feb| 14 Apr| 23 Apr| In Process| |
| 30| ankit_20| 0213| 17 Feb| 05 May| 15 May| In Process| 19 Oct|
| 31| setcanada| 1111| 17 Feb| 06 May| 10 May| In Process| |
| 32| ajithpl| 0213| 17 Feb| 15 May| 28 May| In Process| 02 Nov|
| 33| barundutta76| 4131| 17 Feb| 01 Jun| 07 Jun| RBVO| |
| 34| CHinjukannan| 0111| 17 Feb| 02 Jun| 12 Jun| RBVO| |
| 35| proca| 1111| 20 Feb| 14 Jun| 17 Jun| RBVO| |
| 36| armanican| 0213| 24 Feb| 09 Apr | 24 Apr| In Process| |
| 37| VipalPatel| 0213| 24 Feb| 24 Apr | 29 Apr| RBVO| |
| 38| gujjubhai| 1111| 24 Feb| 10 Jun| 20 Jun| RBVO| |
| 39| gibala| 1111| 24 Feb| 15 Jun| 24 Jun| RBVO| |
| 40| Mpadhya| 4131| 26 Feb| 31 Mar | 09 Apr | Decision Made | 24 Jun| 30 Jul
| 41| uni | 4131 | 01 Mar| 06 Apr | 20 Apr | RBVO| |
| 42| vincentvarghese22| 0213| 03 Mar| 23 Apr | 30 Apr| RBVO| |
| 43| Imran7799| 0213| 03 Mar| 28 Apr| 06 May| RBVO| |
| 44| Canadian4U| 0111| 03 Mar| 08 May| 01 Jun| RBVO| |
| 45| mehak_janvi| 1111| 03 Mar| 04 Jun| 14 Jun| RBVO| |
| 46| bugslife| 3142| 03 Mar| 10 Jun| 17 Jun| RBVO| |
| 47| charmi| 4131| 03 Mar| 17 Jun| N/A| RBVO| |
| 48| sarabjitssingh| 4131| 03 Mar| 20 Jun | 24 Jun| RBVO| |
| 49| Ssakal| 0111| 03 Mar| 28 Jun| 14 Jul| RBVO| |
| 50| Gauri | 4121| 07 Mar| 12 Apr | 23 Apr| In Process| 21 Oct|
| 51| yoshi14400| 3142| 10 Mar| 09 Apr | 19 Apr| RBVO| |
| 52| A.Joshi| 3111| 10 Mar| 03 May | 06 May| RBVO| |
| 53| harprtsingh| 4131| 10 Mar| 23 May | 02 Jun| RBVO| |
| 54| manish82| 0213| 10 Mar| 21 Jun | 05 july| RBVO| |
| 55| kushu| 4131 | 12 Mar| 20 Apr | 27 Apr| RBVO| |
| 56| Gurmeet| 4131| 17 Mar| 27 Apr | 04 May | RBVO| |
| 57| Matlal| 4131| 24 Mar| 24 Apr | 27 Apr | RBVO| |
| 58| Yahoo India| 1111| 24 Mar| 26 Apr | 05 May | RBVO| |
| 59| Nihir| 4131| 24 Mar| 14 Jun | 21 Jun| RBVO| |
| 60| anil_india| 0111| 24 Mar| 12 July | 19 July| RBVO| |
| 61| rvj022000| 0213| 25 Mar| 17 Jun| 23 Jun| RBVO| |
| 62| laklak| 0111| 26 Mar| 07 Apr | 08 Apr| RBVO| |
| 63| champ_indian| 1111 | 27 Mar| XXXX | 30 Jun| RBVO| |
| 64| SIMON123 | AEO | 30 Mar| 14 Apr | 20 Apr | Decision Made| 20 Sep| 02 Nov
| 65| honeyjack| 0111| 30 Mar| 30 Apr | 05 May| RBVO| |
| 66| sakhi| 4131| 30 Mar| 26 May | 10 Jun| RBVO| |
| 67| ms84| AEO| 30 Mar| 26 May | XXXX| RBVO| |
| 68| nikhilmehta| 1111| 30 Mar| 02 Jun| 14 Jun| RBVO| |
| 69| manishmehta| 1111| 30 Mar| 04 Jun| 14 Jun| RBVO| |
| 70| deepaksinghal| 0711| 30 Mar| 05 Jun| 10 Jun| RBVO| |
| 71| RKV| 1111| 30 Mar| 17 Jun| 20 Jun| RBVO| |
| 72| explorer| 7242| 30 Mar| 17 Jun| 23 Jun| RBVO| |
| 73| angelruth| 3152| 30 Mar| 13 Jul| 11 Aug| RBVO| |
| 74| rksharma| 0111| 31 Mar| 28 May| 08 Jun| RBVO| |
 
hi tarakrs,

please add me in the list..................

Pls find my details regarding appln for skilled migrant under noc 0711(construction manager) (New Delhi)..

Apllied: feb 12th
Aor1 : march 23th
File Transfer: MARCH 30th
Docs Send: 05-june-2010
Apllcn review date: 10-june 2010
ecas status: RBVO,Your application and supporting documents were received by the New Delhi office. They are pending review.

I have started to bocome a bit nervous as i have not recieved the medicals yet.
i knw there r many members who r in the que..

moreover, my NOC is removed from the 29 category, is there any thing to panic..can i expect my medicals soon..

please update my details too..

tarakrs said:
| S.No | Name | NOC | File xfer| Doc Sent| 2nd AOR| ECAS| Med/PPR| Got Visa
| 01| letsgocanada| 4131| 19 Jan| 07 Apr| 09 Apr| In Process| 07 Oct|
| 02| anupshinkoo| 0111| 20 Jan| 19 Apr| 22 Apr| In Process| 02 Oct|
| 03| Benjamin Sapkota| 4131| 20 Jan| 30 Apr| 12 May| In Process| 27 Sep|
| 04| caforca| 0111| 20 Jan| N/A| 25 May| In Process| 05 Oct|
| 05| jacob333| 3142| 20 Jan| 06 May| 16 May| Decision Made| 01 Oct| 29 Nov
| 06| Gav| 4131| 27 Jan| 09 Apr| 21 Apr| In Process| 06 Oct|
| 07| vicky_delhi| 0213| 27 Jan| 17 May| 25 May| In Process| 05 Oct|
| 08| sja| 3152| 02 Feb| 09 Apr| 23 Apr| In Process| 21 Oct|
| 09| pshhe| 1111| 02 Feb| 31 May| 01 Jul| In Process| |
| 10| prsh_patel| 0213| 03 Feb| 26 Mar| 03 Apr| Decision Made| 02 Jul| 24 Oct
| 11| purvi2802| 4131| 03 Feb| 23 May| 02 Jun| RBVO| |
| 12| saky626*| 0213| 03 Feb| 23 May| 12 Jun| In Process| 21 Oct|
| 13| batista32036| 1111| 03 Feb| 05 Jun| 15 Jun| In Process| |
| 14| Naavy100| 0111| 06 Feb| 12 Apr| 23 Apr| In Process| 11 Nov|
| 15| thomas78| 0213| 08 Feb| 02 Apr| 08 Apr| In Process| 18 Oct|
| 16| subhash| 0213| 10 Feb| 29 Mar| 07 Apr| Decision Made| 01 Jul| 26 Nov
| 17| nwaraich| 4131| 10 Feb| 06 Apr| 08 Apr| In Process| 21 Oct|
| 18| sachin4canada| 3111| 10 Feb| 21 Apr | 22 Apr| In Process| 20 Oct|
| 19| duttasuvendu| 4131| 10 Feb| 08 May| 25 May| In Process| 08 Nov|
| 20| konda| 4131| 10 Feb| 10 May| 21 May| In Process| |
| 21| lakshmikanthms| 0213| 10 Feb| 27 May| 14 Jun| In Process| 01 Nov|
| 22| cbi| 1111| 17 Feb| 12 May| 21 May| In Process| |
| 23| lavanyar| 4131| 17 Feb| 12 May| 25 May| In Process| |
| 24| ramansra685| 4131| 17 Feb| 03 Jun | 08 Jun| In Process| |
| 25| isha| XXXX| 17 Feb| XXXX| 10 Jun| In Process| 11 Nov|
| 26| aman.pb7| 4131| 17 Feb| 11 Jun | 18 Jun| RBVO| |
| 27| capr| 0213| 17 Feb| 11 Jun | 23 Jun| RBVO| |
| 28| singh092120| 9212| 17 Feb| 26 Mar| 06 Apr| In Process | |
| 29| chandigarthrocks| 4131| 17 Feb| 14 Apr| 23 Apr| In Process| |
| 30| ankit_20| 0213| 17 Feb| 05 May| 15 May| In Process| 19 Oct|
| 31| setcanada| 1111| 17 Feb| 06 May| 10 May| In Process| |
| 32| ajithpl| 0213| 17 Feb| 15 May| 28 May| In Process| 02 Nov|
| 33| barundutta76| 4131| 17 Feb| 01 Jun| 07 Jun| RBVO| |
| 34| CHinjukannan| 0111| 17 Feb| 02 Jun| 12 Jun| RBVO| |
| 35| proca| 1111| 20 Feb| 14 Jun| 17 Jun| RBVO| |
| 36| armanican| 0213| 24 Feb| 09 Apr | 24 Apr| In Process| |
| 37| VipalPatel| 0213| 24 Feb| 24 Apr | 29 Apr| RBVO| |
| 38| gujjubhai| 1111| 24 Feb| 10 Jun| 20 Jun| RBVO| |
| 39| gibala| 1111| 24 Feb| 15 Jun| 24 Jun| RBVO| |
| 40| Mpadhya| 4131| 26 Feb| 31 Mar | 09 Apr | Decision Made | 24 Jun| 30 Jul
| 41| uni | 4131 | 01 Mar| 06 Apr | 20 Apr | RBVO| |
| 42| vincentvarghese22| 0213| 03 Mar| 23 Apr | 30 Apr| RBVO| |
| 43| Imran7799| 0213| 03 Mar| 28 Apr| 06 May| RBVO| |
| 44| Canadian4U| 0111| 03 Mar| 08 May| 01 Jun| RBVO| |
| 45| mehak_janvi| 1111| 03 Mar| 04 Jun| 14 Jun| RBVO| |
| 46| bugslife| 3142| 03 Mar| 10 Jun| 17 Jun| RBVO| |
| 47| charmi| 4131| 03 Mar| 17 Jun| N/A| RBVO| |
| 48| sarabjitssingh| 4131| 03 Mar| 20 Jun | 24 Jun| RBVO| |
| 49| Ssakal| 0111| 03 Mar| 28 Jun| 14 Jul| RBVO| |
| 50| Gauri | 4121| 07 Mar| 12 Apr | 23 Apr| In Process| 21 Oct|
| 51| yoshi14400| 3142| 10 Mar| 09 Apr | 19 Apr| RBVO| |
| 52| A.Joshi| 3111| 10 Mar| 03 May | 06 May| RBVO| |
| 53| harprtsingh| 4131| 10 Mar| 23 May | 02 Jun| RBVO| |
| 54| manish82| 0213| 10 Mar| 21 Jun | 05 july| RBVO| |
| 55| kushu| 4131 | 12 Mar| 20 Apr | 27 Apr| RBVO| |
| 56| Gurmeet| 4131| 17 Mar| 27 Apr | 04 May | RBVO| |
| 57| Matlal| 4131| 24 Mar| 24 Apr | 27 Apr | RBVO| |
| 58| Yahoo India| 1111| 24 Mar| 26 Apr | 05 May | RBVO| |
| 59| Nihir| 4131| 24 Mar| 14 Jun | 21 Jun| RBVO| |
| 60| anil_india| 0111| 24 Mar| 12 July | 19 July| RBVO| |
| 61| rvj022000| 0213| 25 Mar| 17 Jun| 23 Jun| RBVO| |
| 62| laklak| 0111| 26 Mar| 07 Apr | 08 Apr| RBVO| |
| 63| champ_indian| 1111 | 27 Mar| XXXX | 30 Jun| RBVO| |
| 64| SIMON123 | AEO | 30 Mar| 14 Apr | 20 Apr | Decision Made| 20 Sep| 02 Nov
| 65| honeyjack| 0111| 30 Mar| 30 Apr | 05 May| RBVO| |
| 66| sakhi| 4131| 30 Mar| 26 May | 10 Jun| RBVO| |
| 67| ms84| AEO| 30 Mar| 26 May | XXXX| RBVO| |
| 68| nikhilmehta| 1111| 30 Mar| 02 Jun| 14 Jun| RBVO| |
| 69| manishmehta| 1111| 30 Mar| 04 Jun| 14 Jun| RBVO| |
| 70| RKV| 1111| 30 Mar| 17 Jun| 20 Jun| RBVO| |
| 71| explorer| 7242| 30 Mar| 17 Jun| 23 Jun| RBVO| |
| 72| angelruth| 3152| 30 Mar| 13 Jul| 11 Aug| RBVO| |
| 73| rksharma| 0111| 31 Mar| 28 May| 08 Jun| RBVO| |