- Sep 15, 2014
- 40
- 0
- 125
- Category........
- NOC Code......
- 2232
- Job Offer........
- Pre-Assessed..
- App. Filed.......
- 24-12-2014
- Nomination.....
- 26-03-2015
- Med's Request
- 10-06-2015
- Passport Req..
- 07-11-2016
- VISA ISSUED...
- 07-27-2016
Hello All
Could you please advise which NOC better matches my duties
• Developed concepts, specifications, costs, and schedules based upon sound engineering principles with input from customers and technical resources.
• Created 3D CAD models and detailed drawings with application of Geometric Dimensions and Tolerances (GD&T)
• Designed machining Jigs and fixtures, assembly tooling and automatic machinery/systems
• Designed and Developed manufacturing process and assembly methods
• Developed new ideas to reduce design and parts costs, increase overall efficiency
• Responsible for the complete tooling requirements, including costs estimates, and vendor quotations.
• Managed manufacturing sections during Machinery/Equipment Install
• Created project documentation including Bills of Material, spare parts lists, operation and maintenance manuals, assembly procedures and check sheets, repair procedures, management reports, and project schedules
• Performed engineering calculations to determine machine cycle time, Finite Element Analysis (FEA), Failure Mode Effect Analysis (FMEA), static and dynamic accuracy
• Developed and implemented Standards, procedures, methodologies & best practice
Thank You
Could you please advise which NOC better matches my duties
• Developed concepts, specifications, costs, and schedules based upon sound engineering principles with input from customers and technical resources.
• Created 3D CAD models and detailed drawings with application of Geometric Dimensions and Tolerances (GD&T)
• Designed machining Jigs and fixtures, assembly tooling and automatic machinery/systems
• Designed and Developed manufacturing process and assembly methods
• Developed new ideas to reduce design and parts costs, increase overall efficiency
• Responsible for the complete tooling requirements, including costs estimates, and vendor quotations.
• Managed manufacturing sections during Machinery/Equipment Install
• Created project documentation including Bills of Material, spare parts lists, operation and maintenance manuals, assembly procedures and check sheets, repair procedures, management reports, and project schedules
• Performed engineering calculations to determine machine cycle time, Finite Element Analysis (FEA), Failure Mode Effect Analysis (FMEA), static and dynamic accuracy
• Developed and implemented Standards, procedures, methodologies & best practice
Thank You