Hot-Lier
Champion Member
    
Posts: 1194
Ratings: +88
Category........: FAM
Visa Office......: Islamabad
App. Filed.......: 10-06-2011
Doc's Request.: 17-4-2012
AOR Received.: 17-4-2012
File Transfer...: 14-08-2011
Med's Request: 07-06-2012
Med's Done....: 12-06-2012
Interview........: N/A
Passport Req..: 17-08-2012
VISA ISSUED...: 8-09-2012
|
 |
« Reply #3930 on: March 13, 2012, 06:21:11 pm » |
|
hi guys, do you know how long its taking in spousal sponsorship from Islamabad? for 2012-
I guess 17-18 Months ....By Looking at the People Experiences, If things go smooth.
|
|
|
|
|
Logged
|
|
|
|
immigratingcanada2011
Star Member
   
Posts: 65
Ratings: +0
Category........: FAM
Visa Office......: Ottawa/Islamabad
App. Filed.......: March 2012
File Transfer...: June 2012
|
 |
« Reply #3931 on: March 13, 2012, 06:28:01 pm » |
|
Sent off my application to Missassauga today! Praying for a smooth process. Thanks to you guys for the support on questions I had when preparing the package.
|
|
|
|
|
Logged
|
|
|
|
Hot-Lier
Champion Member
    
Posts: 1194
Ratings: +88
Category........: FAM
Visa Office......: Islamabad
App. Filed.......: 10-06-2011
Doc's Request.: 17-4-2012
AOR Received.: 17-4-2012
File Transfer...: 14-08-2011
Med's Request: 07-06-2012
Med's Done....: 12-06-2012
Interview........: N/A
Passport Req..: 17-08-2012
VISA ISSUED...: 8-09-2012
|
 |
« Reply #3932 on: March 13, 2012, 06:33:11 pm » |
|
Sent off my application to Missassauga today! Praying for a smooth process. Thanks to you guys for the support on questions I had when preparing the package.
Best Of Luck and May you have a smooth and speedy Processing !
|
|
|
|
|
Logged
|
|
|
|
shaukatwaqar
Newbie

Posts: 1
Ratings: +0
|
 |
« Reply #3933 on: March 13, 2012, 09:29:06 pm » |
|
Thxxxx bt whn i click on tht decision made it says decision has been made visa office will contact u concerning on ur decision tu ye istarha kiu a rha ha:( y thy use concerning word?
This is normal from CIC-I. You will be getting visa soon. The statement you've mentioned is the same statement they used when they issued visa.
|
|
|
|
|
Logged
|
|
|
|
missingmyjaan
Star Member
  
Posts: 172
Ratings: +3
Visa Office......: ISB
Doc's Request.: March 03 2012
File Transfer...: April 2011
Med's Request: May 15 2012
Med's Done....: May 28 2012
|
 |
« Reply #3934 on: March 13, 2012, 10:46:06 pm » |
|
My timeline is almost same as yours:
11th April 2011 - Islamabad office recieved my application 1st March 2012 - CHC-I start processing my application
I'm still waiting for re-medical and police verification request. May i know what other forms you were talking about along with police verification?
From here it will hardly took 6 to 8 months inshallah. Sooner the better
my timeline is similar too. case was transferred april 28,2011. my husband received letter (dated march 3rd 2012) to submit police certificates + forms. you will get the letter soon inshaAllah, it's probably on its way 
|
|
|
|
|
Logged
|
Sponsoring my hubby. 
|
|
|
Red Jeans
Hero Member
   
Posts: 501
Ratings: +12
Category........: FAM
Visa Office......: Islamabad
App. Filed.......: March 2011
Doc's Request.: Re-pcc,Re-Imm forms and Proof of Ruksati - March 13, 2012
AOR Received.: March 13, 2012
File Transfer...: May 30, 2011 / sent supporting docs voluntarily on 25-feb-2012
Med's Request: May 29, 2012 / rec'd on June 11, 2012
Med's Done....: June 20, 2012 (InshALLAH)
Interview........: Waived !
Passport Req..: May 29, 2012 / rec'd on June 11, 2012
VISA ISSUED...: Aug 2, 2012
LANDED..........: August 24th InshALLAH
|
 |
« Reply #3935 on: March 13, 2012, 11:20:09 pm » |
|
Fj423---------------------- January 2011 [H] Re-Medical request R.Mujgani ----------------- January 2011 [H] Re-PCC + doc request Usrain ------------------------ January 2011 (H) Re-pcc + supp forms CHUMCHUM--------------- January 2011 Anso -----------------------January 2011 [H] Liakram --------------------January 2011 (H) Re.PCC request + IMM forms request +more prove of contact (feb 24) Danny4450----------------- January 2011 [W] Ecas in-process Letter sent by CHC Warda----------------------- January 2011 HASHOO-------------------- January 2011 [W] Hacib23--------------------- January 2011 Re-medical (feb 28)/ Re-pcc & supp forms(feb16) ________________________________________ Became a-loner-----------February 2011 [W] truefriend-------------------February 2011 [W] Anzee-----------------------February 2011 (W) Re-pcc + Forms Jay024--------------------- February 2011 (W) Re-med + PPR Merrakhawaab------------- February 2011 [H] supplementary form + documents request Raptorsfan------------------ February 2011 [W] Ecas status changed to in process ________________________________________ Samno----------------------March 2011 Drwaqas--------------------March 2011 Mahamq245--------------- March 2011 [W] initial medical +++ PPR Blue_angel------------------ March 2011[H] Re-PCC + Supp forms Simba----------------------- March 2011 Mah1906---------------------March2011 (H) Ecas status changed to In process Insaan2011----------------- March 2011 [W] Ecas status changed to In process Sher786---------------------March 2011 Ecas status changed to in process ________________________________________ Masoom_2012 April 2011 (W) Ecas status changed to in process Visionquest ---------------- April 2011 [W] Emanzaib ----------------April 2011 (H) Re- pcc + Add forms Shaukar Waqar ----------April 2011(H) Ecas in process (01/Mar/2012) Blueye ---------------------April 2011 [H] Supplementary form request Yago ----------------------April 2011 [W] RE-PCC + nikah namah Canadian555----------------April 2011 Waljo88---------------------April 2011 Missingmyjaan-------------April 2011 [H] PCC + Forms QD-------------------------- April 2011 ________________________________________ RedJeans-------------May 2011 [W] M_ali hussain ---------May 2011 (W) Maknojia---------------May 2011 (W) Adeelad --------------------May 2011 (W) Adnanham------------------ May 2011 (W) --in process march 5 People_champ---------------May 2011 (W) --in-process march 7 ________________________________________ Philantropist-----------------June 2011 Princesss ------------------- June 2011 Maryamfarhan---------------June 2011 Irsum------------------------June 2011 Fm_jun---------------------- June 2011 AFREEN----------------------June 2011 ___________________________________________
Mississauaga123--------------July 2011 ________________________________________ Hot-lier----------------------August 2011 [W] Sahibzada_2010------------ August 2011 [W] Khilafah5 - ----------------- August 2011 [W] Yasir2k6---------------------- August 2011 [W] ZZAADD---------------------- August 2011 [H] ________________________________________ Sabii-------------------------September 2011 [H] Lonelyinca------------------ September 2011 [W] Quiet Storm------------------ September 2011 [W] Fathoom123------------------- September 2011 [H] Aqeelc--------------------------September 2011[W] Zabi-----------------------------September 2011 [W] Khan10--------------------------September 2011 .H.
--------------------------------- Adilmk123------------------ October 2011
Ezee------------------------- November 2011 Caninfoseeker---------------- November 2011 Omar mirza------------------- November 2011
Emblem----------------------- December 2011
Syedgj------------------------Unknown Immigratingcanada2011---- Unknown Creative.bird----------------- Unknown Rani Jee------------------------ Unknown Ranjah------------------------ Unknown Ali_shah----------------------- Unknown
|
|
|
|
|
Logged
|
I'm the wife who's being sponsored File transfered to CHC-I . . . . 30 May 2011 Re-PCC, Imm forms, proof of wed .. 13 March 2012 E-cas changed to in-process ....... 16 May 2012 Re-medical - June 11, 2012 PPR - June 11, 2012 Decision Made Jul
|
|
|
Red Jeans
Hero Member
   
Posts: 501
Ratings: +12
Category........: FAM
Visa Office......: Islamabad
App. Filed.......: March 2011
Doc's Request.: Re-pcc,Re-Imm forms and Proof of Ruksati - March 13, 2012
AOR Received.: March 13, 2012
File Transfer...: May 30, 2011 / sent supporting docs voluntarily on 25-feb-2012
Med's Request: May 29, 2012 / rec'd on June 11, 2012
Med's Done....: June 20, 2012 (InshALLAH)
Interview........: Waived !
Passport Req..: May 29, 2012 / rec'd on June 11, 2012
VISA ISSUED...: Aug 2, 2012
LANDED..........: August 24th InshALLAH
|
 |
« Reply #3936 on: March 13, 2012, 11:21:06 pm » |
|
May 2011 is full of wife cases .. lol
|
|
|
|
|
Logged
|
I'm the wife who's being sponsored File transfered to CHC-I . . . . 30 May 2011 Re-PCC, Imm forms, proof of wed .. 13 March 2012 E-cas changed to in-process ....... 16 May 2012 Re-medical - June 11, 2012 PPR - June 11, 2012 Decision Made Jul
|
|
|
peoples_champ
Star Member
  
Posts: 135
Ratings: +3
Category........: FAM
Visa Office......: CHC-Islamabad
NOC Code......: N/A
App. Filed.......: 09-05-2011
Doc's Request.: Letter Date: 12-03-2012; Letter Rec'd: 20-3-2012
Nomination.....: N/A
AOR Received.: 09-05-2011
IELTS Request: N/A
File Transfer...: 30-05-2011
Med's Request: 15-03-2012
Med's Done....: First Med. 07-03-2011 Sec Med. 22-3-2012
Interview........: Waived
Passport Req..: Letter Date: 12-03-2012; Letter Rec'd: 20-3-2012; Passport mailed: 22-3-2012
VISA ISSUED...: Passport received: 16-05-2012
LANDED..........: 25-05-2012
|
 |
« Reply #3937 on: March 13, 2012, 11:50:07 pm » |
|
Update.
My wife got letter from CHC-Islamabad requesting Re-PCC & Supplementary forms along with Police Clearance Certificate & Proof of my recent visit to pak and picture after wedding.
They did not ask for any phone bill etc
great news. congrats
|
|
|
|
|
Logged
|
|
|
|
peoples_champ
Star Member
  
Posts: 135
Ratings: +3
Category........: FAM
Visa Office......: CHC-Islamabad
NOC Code......: N/A
App. Filed.......: 09-05-2011
Doc's Request.: Letter Date: 12-03-2012; Letter Rec'd: 20-3-2012
Nomination.....: N/A
AOR Received.: 09-05-2011
IELTS Request: N/A
File Transfer...: 30-05-2011
Med's Request: 15-03-2012
Med's Done....: First Med. 07-03-2011 Sec Med. 22-3-2012
Interview........: Waived
Passport Req..: Letter Date: 12-03-2012; Letter Rec'd: 20-3-2012; Passport mailed: 22-3-2012
VISA ISSUED...: Passport received: 16-05-2012
LANDED..........: 25-05-2012
|
 |
« Reply #3938 on: March 14, 2012, 12:03:45 am » |
|
May 2011 is full of wife cases .. lol
koi shuk 
|
|
|
|
|
Logged
|
|
|
|
sabii
Champion Member
    
Posts: 2689
Ratings: +114
Visa Office......: Islamabad (Husband Case)
App. Filed.......: July 2011
Doc's Request.: June 2012 -IMM & Supp Forms
File Transfer...: Sept 2011
Med's Request: June 2012
Med's Done....: June 2012
Interview........: Waived
Passport Req..: Feb 2013 along with RePCC
VISA ISSUED...: March 2013
|
 |
« Reply #3939 on: March 14, 2012, 12:23:22 am » |
|
May 2011 is full of wife cases .. lol
Yea,u r rite lol
|
|
|
|
|
Logged
|
|
|
|
tabasumali
Star Member
  
Posts: 106
Ratings: +2
Category........: FAM
Visa Office......: islamabad
App. Filed.......: 1-jan-2011
AOR Received.: 14-feb-2012
IELTS Request: koi na
File Transfer...: 11 march 2011
Med's Request: 12 JULY 2012
Med's Done....: 20 JULY 2012
Interview........: Waived
Passport Req..: waiting
VISA ISSUED...: waiting
LANDED..........: trying
|
 |
« Reply #3940 on: March 14, 2012, 12:43:05 am » |
|
my timeline is similar too. case was transferred april 28,2011. my husband received letter (dated march 3rd 2012) to submit police certificates + forms. you will get the letter soon inshaAllah, it's probably on its way  i am with same time line applicaton received at islamabad 11 mar 2011 get aor on 26 feb 2012 with forms pakistani national form+sponser questioneiar+PCC+original marriage certificate+weding and afetr wedding photos+birth certificate+Sponser visit detail i.e air tickets,barding pass,emails copies,telephone calls records plz make sure u attest all translation of documents with notery public i just send all there stuff today hope they like it
|
|
|
|
|
Logged
|
Tabasum Cheema
|
|
|
Khilafah5
Champion Member
    
Posts: 2277
Ratings: +66
Category........: FAM
Visa Office......: Islamabad
App. Filed.......: June 29 2011
AOR Received.: August 31 2011
File Transfer...: September 15 2011
Med's Request: June 8 2012
Med's Done....: June 11 2012
Passport Req..: July 16 2012
VISA ISSUED...: AUGUST 02, 2012
LANDED..........: August 24th 2012
|
 |
« Reply #3941 on: March 14, 2012, 12:50:25 am » |
|
Fj423---------------------- January 2011 [H] Re-Medical request R.Mujgani ----------------- January 2011 [H] Re-PCC + doc request Usrain ------------------------ January 2011 (H) Re-pcc + supp forms CHUMCHUM--------------- January 2011 Anso -----------------------January 2011 [H] Liakram --------------------January 2011 (H) Re.PCC request + IMM forms request +more prove of contact (feb 24) Danny4450----------------- January 2011 [W] Ecas in-process Letter sent by CHC Warda----------------------- January 2011 HASHOO-------------------- January 2011 [W] Hacib23--------------------- January 2011 Re-medical (feb 28)/ Re-pcc & supp forms(feb16) ________________________________________ Became a-loner-----------February 2011 [W] truefriend-------------------February 2011 [W] Anzee-----------------------February 2011 (W) Re-pcc + Forms Jay024--------------------- February 2011 (W) Re-med + PPR Merrakhawaab------------- February 2011 [H] supplementary form + documents request Raptorsfan------------------ February 2011 [W] Ecas status changed to in process ________________________________________ Samno----------------------March 2011 Drwaqas--------------------March 2011 Mahamq245--------------- March 2011 [W] initial medical +++ PPR Blue_angel------------------ March 2011[H] Re-PCC + Supp forms Simba----------------------- March 2011 Mah1906---------------------March2011 (H) Ecas status changed to In process Insaan2011----------------- March 2011 [W] Ecas status changed to In process Sher786---------------------March 2011 Ecas status changed to in process tabasumali------------------March 2011 re-pcc, imm forms, nikah nama, more proofs ________________________________________ Masoom_2012 April 2011 (W) Ecas status changed to in process Visionquest ---------------- April 2011 [W] Emanzaib ----------------April 2011 (H) Re- pcc + Add forms Shaukar Waqar ----------April 2011(H) Ecas in process (01/Mar/2012) Blueye ---------------------April 2011 [H] Supplementary form request Yago ----------------------April 2011 [W] RE-PCC + nikah namah Canadian555----------------April 2011 Waljo88---------------------April 2011 Missingmyjaan-------------April 2011 [H] PCC + Forms QD-------------------------- April 2011 ________________________________________ RedJeans-------------May 2011 [W] M_ali hussain ---------May 2011 (W) Maknojia---------------May 2011 (W) Adeelad --------------------May 2011 (W) Adnanham------------------ May 2011 (W) --in process march 5 People_champ---------------May 2011 (W) --in-process march 7 ________________________________________ Philantropist-----------------June 2011 Princesss ------------------- June 2011 Maryamfarhan---------------June 2011 Irsum------------------------June 2011 Fm_jun---------------------- June 2011 AFREEN----------------------June 2011 ___________________________________________
Mississauaga123--------------July 2011 ________________________________________ Hot-lier----------------------August 2011 [W] Sahibzada_2010------------ August 2011 [W] Khilafah5 - ----------------- August 2011 [W] Yasir2k6---------------------- August 2011 [W] ZZAADD---------------------- August 2011 [H] ________________________________________ Sabii-------------------------September 2011 [H] Lonelyinca------------------ September 2011 [W] Quiet Storm------------------ September 2011 [W] Fathoom123------------------- September 2011 [H] Aqeelc--------------------------September 2011[W] Zabi-----------------------------September 2011 [W] Khan10--------------------------September 2011 .H.
--------------------------------- Adilmk123------------------ October 2011
Ezee------------------------- November 2011 Caninfoseeker---------------- November 2011 Omar mirza------------------- November 2011
Emblem----------------------- December 2011
Syedgj------------------------Unknown Immigratingcanada2011---- Unknown Creative.bird----------------- Unknown Rani Jee------------------------ Unknown Ranjah------------------------ Unknown Ali_shah----------------------- Unknown
|
|
|
|
|
Logged
|
|
|
|
tabasumali
Star Member
  
Posts: 106
Ratings: +2
Category........: FAM
Visa Office......: islamabad
App. Filed.......: 1-jan-2011
AOR Received.: 14-feb-2012
IELTS Request: koi na
File Transfer...: 11 march 2011
Med's Request: 12 JULY 2012
Med's Done....: 20 JULY 2012
Interview........: Waived
Passport Req..: waiting
VISA ISSUED...: waiting
LANDED..........: trying
|
 |
« Reply #3942 on: March 14, 2012, 01:11:07 am » |
|
i just handover my package to TCS all Original edu docs+pcc+suppl forms what is next step and expected time my status still shows application receievd
|
|
|
|
|
Logged
|
Tabasum Cheema
|
|
|
Red Jeans
Hero Member
   
Posts: 501
Ratings: +12
Category........: FAM
Visa Office......: Islamabad
App. Filed.......: March 2011
Doc's Request.: Re-pcc,Re-Imm forms and Proof of Ruksati - March 13, 2012
AOR Received.: March 13, 2012
File Transfer...: May 30, 2011 / sent supporting docs voluntarily on 25-feb-2012
Med's Request: May 29, 2012 / rec'd on June 11, 2012
Med's Done....: June 20, 2012 (InshALLAH)
Interview........: Waived !
Passport Req..: May 29, 2012 / rec'd on June 11, 2012
VISA ISSUED...: Aug 2, 2012
LANDED..........: August 24th InshALLAH
|
 |
« Reply #3943 on: March 14, 2012, 01:57:52 am » |
|
Hey tabasumali.. UR E-CAS never changed to inprocess?
|
|
|
|
|
Logged
|
I'm the wife who's being sponsored File transfered to CHC-I . . . . 30 May 2011 Re-PCC, Imm forms, proof of wed .. 13 March 2012 E-cas changed to in-process ....... 16 May 2012 Re-medical - June 11, 2012 PPR - June 11, 2012 Decision Made Jul
|
|
|
Hot-Lier
Champion Member
    
Posts: 1194
Ratings: +88
Category........: FAM
Visa Office......: Islamabad
App. Filed.......: 10-06-2011
Doc's Request.: 17-4-2012
AOR Received.: 17-4-2012
File Transfer...: 14-08-2011
Med's Request: 07-06-2012
Med's Done....: 12-06-2012
Interview........: N/A
Passport Req..: 17-08-2012
VISA ISSUED...: 8-09-2012
|
 |
« Reply #3944 on: March 14, 2012, 02:03:06 am » |
|
CHC Pace is Good For 2011 ! Hoping it will keep the Tempo !
|
|
|
|
|